Qualification Standard

Authorising body: Ministry of Industry and Trade
Group of fields: Construction, Geodesy and Carthography
Occupation: Dry construction fitter
Validity of standard: from 29/1/2009
Qualification level: 3

Qualification Standard

Vocational competence Level

Knowledge and comprehension of the construction documentation of buildings and the use of the technical documentation of dry construction structures, as well as the ability to read the detailed drawings of dry construction structures

3

Knowledge and comprehension of the technological procedures of the installation of dry construction structures according to specifications by manufacturers and technical regulations

3

Proposal of work procedures, choice of materials, tools and aids for installation of dry constructions

3

Measuring the position of the wall supporting structures of dry constructions

3

Calculation of the material consumption

3

Transport and storage of materials

2

Modifying the size and shapes of boards and building materials

2

Finishing work on dry construction sheathing by bonding and grinding

2

Installation of wooden and metal supporting structures of dry wall constructions including their connection to neighbouring structures

3

Cladding of building structures walls and dry wall constructions using wooden boards

2

Installation of thermal and sound insulations in dry construction systems

2

Preparation for electrical installation in walls and suspended ceilings

2

Installation of partitions, hanging drywalls and installation walls

3

Fixing objects to walls and suspended ceilings

2

Connection of walls

3

Fitting door and window frames

3

Cladding beams and columns

3

Installation of supporting structures of suspended ceilings

3

Cladding suspended ceilings

2

Implementation of suspended systems of coffered ceilings

3

Installation of arch structures of walls and suspended ceilings

3

Implementation of loft conversions using the dry construction system with wooden and metal support structures

3

Installation of dry floating floors

3

Following entities have contributed